Commercial

Tilburg distribution centre ready for the future

For a new 40,000 m² distribution centre, we supplied a complete heating and ventilation solution, connected to the building's heat pumps.

The challenge

For a new 40,000 m² distribution centre, we supplied a complete heating and ventilation solution, connected to the building’s heat pumps.

Together with the installer, we mapped out the situation and chose the solution that best suits the building and its use.

Working with the installer

From the first design onwards, we worked together with the installer. That way, the choice of units fitted seamlessly with the heat pumps and the building management system.

Ready for expansion

The distribution centre will grow in the coming years. The system is modular, so units can be added without major work.

Which language should we use?

Commercial brochure

Fill in your details and get instant access to the brochure.

"*" indicates required fields

Horticulture brochure

Fill in your details and get instant access to the brochure.

"*" indicates required fields